Location | Aviemore, PH22 |
Client | AMC Homes |
Completion | TBC |
Building size | Main: 60m x 12.1m Extension: 20m x 12.1m |
Eaves height | 4.2m and 6m |
Following the successful completion of Phase One, AMC Homes commissioned Phase 2 of the Granish Industrial Estate development – units 10-17.
The development consists of two connected buildings designed to work together whilst maintaining independent roof systems, providing flexible commercial space for local businesses.
Highland-ready industrial complex
This latest phase delivers a robust 60m x 12.1m portal frame with an offset ridge and a 20m x 12.1m extension.
All steelwork is hot dip galvanised to 85 microns, protecting against the harsh Highland climate for decades.
Durable and energy-efficient
The roof features composite panels with 115mm insulation and 24 triple-skin GRP roof lights, flooding the space with natural light.
Wall cladding combines high-performance Kingspan systems for optimal thermal efficiency and weather resistance.
Smart & practical design
Space for eight roller shutters and eight framed windows ensure easy access, ventilation, and daylight.
Trimline guttering with PVC downpipes manages rainwater effectively, while galvanised purlins and eaves beams complete the weatherproof structure.
Built for now and for the future
Fully compliant with British and European standards, this low-maintenance build offers a flexible industrial space that’s ready for today’s needs and tomorrow’s expansion.
Start your project with us.